Pune University BE (Production Engineering) Project Management Question Papers

 

B.E. (Production S/W)

 

PROJECT MANAGEMENT

 

(Sem. – I) (2003 Course) (Elective – II) (411125)

 

Time : 3 Hours

Max. Marks : 100

Instructions to the candidates:

 

1) All questions are Compulsory.

 

2) Answers to the two sections should be written in separate books.

 

3) Neat diagrams must be drawn wherever necessary.

 

4) Figures to the right indicate full marks.

 

5) Use of logarithmic tables, slide rule, Mollier charts, electronic pocket calculator and steam tables is allowed.

 

6) Assume suitable data, if necessary.

 

SECTION – I

 

Q1) Explain in detail methods to identify project.

OR

Q2) Enumerate difference of project under private, public and joint sector.

Q3)

Explain following :

a) Type of project under BMRED Balancing.

b) Modernization, Replacement.

OR

 

Q4) Explain :

a) Expansion of project.

b) Diversification of project.

 

Q5)

Explain project formulation in consideration with preparation of feasibility report and  pecifications.

OR

 

Q6)

What are the incentives from state and central govt. Explain advantages and applications of import substitution projects.

SECTION – II

 

Q7)

Explain different sources of finance for project. Address the issues of raising local and foreign investments.

OR

 

Q8)

Write note on following for project appraisal :

a) Techno – commercial.

b) Financial discounted cash flow.

c) Non financial benefit.

d) Socio- economic cost benefit analysis.

 

Q9) Enumerate different aspects of project costing, contracting for labour and equipment costs.

OR

 

Q10)

a) What are the different aspects for development and codification of cost data.

b) Explain the advantages of using Activity-Based costing in detail.

Q11)

Explain following for project Administration :

a) Cash flow planning.

b) Project scheduling.

OR

 

Q12)

Write short notes on following (any three) :

a) PERT.

b) CPM.

c) GANTT Charts.

d) Overruns cost