{"id":39937,"date":"2021-12-23T11:59:00","date_gmt":"2021-12-23T06:29:00","guid":{"rendered":"https:\/\/www.kopykitab.com\/blog\/?p=39937"},"modified":"2023-11-20T10:36:22","modified_gmt":"2023-11-20T05:06:22","slug":"psu-recruitment-through-gate","status":"publish","type":"post","link":"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/","title":{"rendered":"PSU Recruitment through GATE 2024 | Know The Eligibility, Exam Pattern, And More."},"content":{"rendered":"<p><img class=\"alignnone size-full wp-image-133194\" src=\"https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/09\/PSU-Recruitment-Through-GATE.jpg\" alt=\"PSU Recruitment through GATE\" width=\"1200\" height=\"675\" srcset=\"https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/09\/PSU-Recruitment-Through-GATE.jpg 1200w, https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/09\/PSU-Recruitment-Through-GATE-768x432.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p><strong>PSU Recruitment Through GATE 2024<\/strong>: If you are looking for a job in any of the PSUs, you must have a robust and high-intensity technical understanding and knowledge of middle engineering principles. You can do that by clearing the <a href=\"https:\/\/www.kopykitab.com\/blog\/gate-notification\/\" target=\"_blank\" rel=\"noopener\">GATE exam<\/a> where there are more than two thousand vacancies are currently available for a graduate in engineering in important PSUs across India.<\/p>\n<p>The listing includes IOCL BHEL, NTPC, BPCL, CEL Power Grid. As IIT Kharagpur conducts the exam, all the public sector agencies recruit Engineer Trainees (ET) based on the GATE ratings. To know more about the PSU Recruitment Through GATE 2024, read the whole blog.\u00a0<\/p>\n<p><a href=\"https:\/\/www.kopykitab.com\/GATE-12-Years-Solved-Papers-General-Aptitude-Year-wise-2010-2021-For-2022-Exam-by-Panel-Of-Experts\/?source=CRO_GATE\" target=\"_blank\" rel=\"noopener\"><img class=\"alignnone wp-image-159670 size-full\" src=\"https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/12\/Ultimate-Material-To-Become-GATE-2022-General-Aptitude-Expert.jpg\" alt=\"Ultimate-Material-To-Become-GATE-2022-General-Aptitude-Expert\" width=\"1200\" height=\"444\" srcset=\"https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/12\/Ultimate-Material-To-Become-GATE-2022-General-Aptitude-Expert.jpg 1200w, https:\/\/www.kopykitab.com\/blog\/wp-content\/uploads\/2021\/12\/Ultimate-Material-To-Become-GATE-2022-General-Aptitude-Expert-768x284.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_47_1 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"ez-toc-toggle-icon-1\"><label for=\"item-6a01dd06b3bca\" aria-label=\"Table of Content\"><span style=\"display: flex;align-items: center;width: 35px;height: 30px;justify-content: center;direction:ltr;\"><svg style=\"fill: #000000;color:#000000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #000000;color:#000000\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/label><input  type=\"checkbox\" id=\"item-6a01dd06b3bca\"><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-visibility-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#gate-scores-for-psu-recruitment\" title=\"GATE Scores for PSU Recruitment\">GATE Scores for PSU Recruitment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#psu-recruitment-through-gate-2024-%e2%80%93-eligibility-criteria\" title=\"PSU Recruitment Through GATE 2024 &#8211; Eligibility Criteria\">PSU Recruitment Through GATE 2024 &#8211; Eligibility Criteria<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#age\" title=\"Age\">Age<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#nationality\" title=\"Nationality\">Nationality<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#educational-qualification\" title=\"Educational Qualification\">Educational Qualification<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#marks-criteria\" title=\"Marks Criteria\">Marks Criteria<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#psu-recruitment-through-gate-%e2%80%93-selection-process-2024\" title=\"PSU Recruitment Through GATE &#8211; Selection Process 2024\">PSU Recruitment Through GATE &#8211; Selection Process 2024<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#list-of-psu-recruitment-through-gate-2023\" title=\"List of PSU Recruitment through GATE 2023\">List of PSU Recruitment through GATE 2023<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#other-important-information-for-gate-2023-exam\" title=\"Other Important Information for GATE 2023 Exam\">Other Important Information for GATE 2023 Exam<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#type-of-psu-jobs-through-gate\" title=\"Type Of PSU Jobs Through GATE\">Type Of PSU Jobs Through GATE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#salary-structure-of-working-in-psus\" title=\"Salary Structure Of Working In PSUs\">Salary Structure Of Working In PSUs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#faqs-on-psu-recruitment-through-gate-2023\" title=\"FAQs on PSU Recruitment Through GATE 2023\">FAQs on PSU Recruitment Through GATE 2023<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#what-is-the-selection-process-of-psu-recruitment-2023\" title=\"What is the selection process of PSU recruitment 2023?\">What is the selection process of PSU recruitment 2023?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#what-is-the-educational-qualification-for-psu-recruitment-2023\" title=\"What is the educational qualification for PSU Recruitment 2023?\">What is the educational qualification for PSU Recruitment 2023?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#other-than-psu-recruitment-through-gate-what-are-the-other-ways\" title=\"Other than PSU Recruitment through GATE, what are the other ways?\">Other than PSU Recruitment through GATE, what are the other ways?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/#what-is-the-age-criteria-for-the-general-category-for-psu-recruitment\" title=\"What is the age criteria for the General category for PSU Recruitment?\">What is the age criteria for the General category for PSU Recruitment?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"gate-scores-for-psu-recruitment\"><\/span>GATE Scores for PSU Recruitment<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p dir=\"ltr\">Recruitment in various PSUs is usually conducted on the basis of GATE scores. While all of the candidates are needed to have qualified GATE with the required cutoff, the specific scores for the recruitment will be announced by each company.<\/p>\n<p dir=\"ltr\">For some GATE PSU recruitments, only the present year score will be accepted while some recruitment also accept previous year scores. GATE scores are not valid for three years for PSU recruitment.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"psu-recruitment-through-gate-2024-%e2%80%93-eligibility-criteria\"><\/span>PSU Recruitment Through GATE 2024 &#8211; Eligibility Criteria<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To be able to get recruited in the PSUs through GATE, you must fulfil the Eligibility Criteria.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"age\"><\/span>Age<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ol>\n<li>For General candidates, it is between 21-27 years.<\/li>\n<li>For SC\/ST candidates, it is between 21-30 years.<\/li>\n<\/ol>\n<h3><span class=\"ez-toc-section\" id=\"nationality\"><\/span>Nationality<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ol>\n<li>Indian citizes are eligible for the recruitment process.<\/li>\n<li>Citizens from Bangladesh, Ethiopia, Nepal, UAE and Sri Lanka are also eligible.<\/li>\n<\/ol>\n<h3><span class=\"ez-toc-section\" id=\"educational-qualification\"><\/span>Educational Qualification<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Only those candidates can apply who have completed their graduation in B.Tech or BE, or the final students are also eligible for the GATE exam.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"marks-criteria\"><\/span>Marks Criteria<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ol>\n<li>There is a 65% marks criteria in graduation for most of the PSUs.\u00a0<\/li>\n<li>The candidates with 70% or more in the graduation can apply to all the PSUs.<\/li>\n<li>You must have the GATE scorecard to apply for PSUs.<\/li>\n<\/ol>\n<h2><span class=\"ez-toc-section\" id=\"psu-recruitment-through-gate-%e2%80%93-selection-process-2024\"><\/span>PSU Recruitment Through GATE &#8211; Selection Process 2024<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To apply for the PSU Recruitment Through GATE, you have to complete the selection process. Follow these steps for completing the selection process.<\/p>\n\n<div id=\"rank-math-howto\" class=\"rank-math-block\" >\n<div class=\"rank-math-howto-description\">\n\n<\/div>\n\n<div class=\"rank-math-steps \">\n<div id=\"howto-step-1632822437591\" class=\"rank-math-step\">\n<p class=\"rank-math-step-title \">1. Fill out the registration form from the official website and send it with the fee.<\/p>\n<\/div>\n<div id=\"howto-step-1632822575302\" class=\"rank-math-step\">\n<p class=\"rank-math-step-title \">2. After the GATE result, you will be shortlisted for the PSUs. The shortlisted aspirants will appear for written exams.<\/p>\n<\/div>\n<div id=\"howto-step-1632822633828\" class=\"rank-math-step\">\n<p class=\"rank-math-step-title \">3. The candidates shortlisted from the written exam will go for Group Discussion, and the Personal Interview\u00a0will be conducted for those who have cleared the GD Round.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"list-of-psu-recruitment-through-gate-2023\"><\/span>List of PSU Recruitment through GATE 2023<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>List of PSU Recruitment through GATE 2022 Here is a list of PSU Recruitment through GATE 2023 scores. The number of vacancies, disciplines, application date with the name of the PSU is given below in the table.<\/p>\n<p>You can also find a list of PSUs that recruit for Mechanical, Civil, CS, IT, Chemical, Electrical, etc engineering disciplines.<\/p>\n<table style=\"width: 100%;\">\n<tbody>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\"><strong>Name of PSU<\/strong><\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\"><strong>Number of Posts<\/strong><\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\"><strong>Discipline<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">IOCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">B.Tech\/ B.E in Chemical, Electrical, Instrumentation, Mechanical, Civil,<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Power Grid<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">50<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">ET (Electrical)\/ET (Electronics) ET (Civil)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">ODISHA POWER TRANSMISSION CORPORATION LIMITED<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">31<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">HPGCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">201<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Mechanical, and Civil<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">GAIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">Chemical &#8211; 15<\/p>\n<p dir=\"ltr\">Instrumentation &#8211; 10<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Chemical, Petrochemical, Chemical Technology, Petrochemical Technology, Instrumentation, Instrumentation &amp; Control, Electronics &amp; Instrumentation, Electrical &amp; Instrumentation, Electronics, Electrical &amp; Electronics<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">DRDO<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">To be notified<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics &amp; Comm. Engg, Mechanical Engg, Computer Science &amp; Engg, Chemical Engg, Chemistry, Physics, Electrical Engg, Aeronautical Engg, Mathematics, Metallurgy, Material Science, Civil Engg, Geology, Instrumentation Engg, Textile Engg, Production\/Industrial Production Engg, Food Science<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NPCIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">200<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Chemical, Electrical, Electronics, Instrumentation, Civil, Industrial, and Fire Safety engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NMDC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">Electrical- 10<\/p>\n<p dir=\"ltr\">Materials Management &#8211; 25<\/p>\n<p dir=\"ltr\">Mechanical &#8211; 14<\/p>\n<p dir=\"ltr\">Mining &#8211; 18<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Materials Management, Mechanical, Mining<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NHPC Limited<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">Civil &#8211; 30<\/p>\n<p dir=\"ltr\">Mechanical-21<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil and Mechanical<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">KIOCL Limited<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">25<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical\/Metallurgical, Electrical\/Electrical and Electronics, Electronics &amp; Communication\/ Instrumentation &amp; Control, Electronics &amp; Communication\/ Computer Science, Mining<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">AAI<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">360<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil\/ Electrical\/Electronics\/ Telecommunications\/ Electrical with specialization in Electronics \/ Architecture<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NTPC Limited<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">280<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Electronics, and Instrumentation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NHAI<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">41<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NALCO<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">120<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Metallurgy, Electronics, lnstrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BIS<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">150<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical Engineering, Metallurgical Engineering, Civil Engineering, Electrical Engineering, Electronics &amp; Telecommunication Engineering, Computer Engineering, Food Technology, Chemical Engineering, Bio-Technology, Petro-Chemical Engineering, Bio-medical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">HURL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">80<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Chemical, Mechanical, Electrical and Instrumentation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BARC: OCES, DGFS<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical Engineering. Civil Engineering, Electrical Engineering. Electronics &amp; Communication engineering, computer Science, Metallurgical Engineering, Chemical Engineering, Instrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">ECIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">64<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics &amp; Communication Engineering, Electronics &amp; Telecommunication Engineering, Electronics Engineering, Electronics Technology, Mechanical Engineering, Mechanical [Production] Engineering, Computer Science Engineering, Computer Engineering, Computer Technology<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">OMPL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">16<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Chemical, Mechanical, Electrical, Instrumentation and IT<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">SAIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">399<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Mining, Chemical, Instrumentation, Metallurgy<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">PSPCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">111<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical\/ Electrical &amp; Electronics Engineering\/ Civil Engineering\/ Computer Science\/ IT<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MNRE<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">10<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Natural or Agricultural Science or Bachelor\u2019s Degree in Engineering or Technology or Medicine from a recognized university or institute.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">CVPPPL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">20<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">POSOCO<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical\/ Electrical (Power)\/ Electrical and Electronics\/ Power Systems Engineering\/ Power Engineering (Electrical)\/ Computer Science\/ Computer Engg.\/ Information Technology<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">WBSEDCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical Engineering, Electrical &amp; Electronics (Combined), Power Engineering, Civil Engineering, Construction Engineering, Mechanical Engineering, Information Technology, Computer Science<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">ONGC Ltd.<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Petroleum, Civil, Electrical, Electronics, Telecom, E&amp;T, PG in Physics with Electronics, Instrumentation, Chemical, Applied Petroleum, PG in Geo-Physics, PG in Mathematics, PG in Petroleum Technology, PG in Chemistry, PG in Geology, PG in Petroleum, Geo-Science, PG in Geological Technology, Auto, Computer, Information Technology, MCA, \u201cB\u2019Level Diploma as per Dept of Electronics, GO<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">HPCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Mechanical &amp; Production, Civil, Electrical, Electrical &amp; Electronics , Electronics, Electronics &amp; Communication, Electronics &amp; Telecommunication, Applied Electronics, Instrumentation, Instrumentation &amp; Control, Electronics &amp; Instrumentation, Instrumentation &amp; Electronics, Instrumentation &amp; Process Control, Chemical, Petrochemical, Petroleum Refining &amp; Petrochemical, Petroleum Refining<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BMRC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">25<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Bihar PHED<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">70<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical and Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">DST Bihar<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics and Communication, Mechanical, Civil, Electrical, Computer Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BSNL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">198<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical\/Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MDL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">8<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Mechanical &amp; Industrial, Mechanical &amp; Production, Production , Production &amp; Management, Production &amp; Industrial, Electrical, Electrical &amp; Electronics, Electrical &amp; Instrumentation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Vizag Steel<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Metallurgy, Instrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MGL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">15<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Civil, Instrumentation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">RITES<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">To be notified<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering\/ Mechanical Engineering\/ Production Engineering\/ Industrial Engineering\/ Automobile Engineering\/ Electrical Engineering\/ Electrical &amp; Electronics Engineering\/ Electronics Engineering\/ Electronics &amp; Telecommunication Engineering\/ Electronics &amp; Communication Engineering\/ Electronics &amp; Electrical Engineering\/ Computer Science\/ IT\/ Computer Engineering\/ Electronics &amp; Instrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">CEL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics &amp; Communication, Mechanical, Electrical, Material Science<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Centre For Railway Information Systems<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">50<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Computer Science &amp; Engineering or Computer Science or Computer Technology or Information Technology or Computer Science &amp; Information Technology or Computer Applications, or MCA or B.Sc (Computer Science \u2013 4 Year degree course)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Haryana Power Utilities<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">107<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics, Electronics &amp; Communication, Electronics &amp; Electrical, Communication, Civil, Mechanical, Electrical, Electrical &amp; Electronics<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MRPL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">27<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Mechanical, Civil, Chemical, Electronics &amp; Communication Engineering, Instrumentation and Information Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">DDA<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">14<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Electrical and Mechanical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NBCC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">RVNL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Electrical and Electronics &amp; Telecommunication Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MECL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Chemistry<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">RCFL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Chemical or Electrical &amp; Instrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NFL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Instrumentation, Materials, Computer Science, IT or Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">EIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Mechanical and Chemical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BSPHCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Construction, Electrical, Electrical &amp; Electronics<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">MPPGCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical and Electronics Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">THDC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical\/Mechanical &amp; Automation Engineering\/ Electrical\/ Electrical (Power)\/ Electrical and Electronics\/ Power Systems &amp; High Voltage\/Power Engineering\/ Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BPCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NLC India Ltd<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical &amp; Electronics, Electrical, Electronics &amp; Communication, Civil, Civil &amp; Structural, Instrumentation,Electronics, Instrumentation, Instrumentation &amp; Control, Computer Science, Information Technology, Mining<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BHEL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Industrial and Production, Industrial, Mechanical Production and Tool, Production Technology, Manufacturing (NIFFT Ranchi), Mechatronics, Manufacturing Process and Automation, Power Plant Production, Production and Industrial, Thermal, Manufacturing Technology, Power, Electrical &amp; Electronics, Electrical, Instrumentation &amp; Control, High Voltage Power Systems &amp; High Voltage, Electrical Machine,Electronics &amp; Power, Power Electronics, Power Plant, Energy, Power<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">ECIL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electronics and Communication Engineering, Electronics and Telecommunication Engineering, Electronics Engineering, Electronics Technology, Computer Science Engineering, Computer Engineering, Computer Technology, Mechanical Engineering, Mechanical (Production) Engineering.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">HAL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Mechanical &amp; Industrial, Mechanical and Production, Civil, Electrical, Electrical &amp; Electronics, Electrical &amp; Instrumentation, Electronics, Electronics &amp; Communication, Instrumentation &amp; Control, Instrumentation &amp; Electronics, Applied Electronics &amp; Instrumentation, Electronics &amp; Instrumentation, Electronics &amp; Telecommunication<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BEML<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical &amp; Electronics, Metallurgy<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">OIL India<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Geophysics, Geology<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BBNL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical and Electronics, Electrical, Information Technology, Computer Science, Electronics and Communication<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Tata Power<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Mechanical, Electronics, Controls and Instrumentation, Power Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Cabinet Secretariat, Govt. of India<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Computer Science, Electronics and Communications, Electronics, Physics, Chemistry, Telecommunication, Electronics<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Midhani<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Metallurgy<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">DMRC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">35<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">IRCON<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Electrical<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BSPCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Electrical &amp; Electronics,Mechanical , Production, Industrial Engineering, Production &amp; Industrial Engineering, Thermal, Mechanical &amp; Automation, Power Engineering, Civil Engineering, Electronics &amp; Instrumentation, Instrumentation &amp; Control Electronics, Electronics &amp; Tele-communication, Electronics &amp; Power, Power Electronics , Electronics &amp; Communication, CSE, IT<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">IPR<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Physics, Applied Physics, Engineering Physics, Mechanical Engineering, Electrical Engineering, Electrical &amp; Electronics Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">PSTCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Electrical &amp; Electronics, Mechanical, Electronics &amp; Communication, Instrumentation &amp; Control, Civil, Computer Science, IT<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">KRIBHCO<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Chemical, Mechanical, Electrical, Civil, Computer, Electronics &amp; Communication and Instrumentation Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Mumbai Railway Vikas Corporation Ltd (MRVC Ltd)<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">GSECL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Mechanical, C &amp; I, Metallurgy and Environment Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">Coal India Ltd<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Mining and Geology<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">BNPM<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Electronics &amp; Communication and Chemical Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">EdCIL India<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil, Electronics &amp; Communication Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">KRCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Civil Engineering, Mechanical Engineering, Electrical Engineering, Electrical &amp; Electronics Engineering, Electronics Engineering, Electronics &amp; Telecommunication Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">OPGC Ltd<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Mechanical, Electrical, Civil, C &amp; I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">IPRCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical, Civil, Electronics\/Electrical<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NSPCL<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Electrical\/ Electrical &amp; Electronics\/ Electrical, Instrumentation &amp; Control\/ Power Systems &amp; High Voltage\/ Power Electronics\/ Power Engineering\/ Mechanical\/ Production\/ Industrial Engg.\/ Production &amp; Industrial Engg.\/ Thermal\/ Mechanical &amp; Automation\/ Power Engineering\/ Electronics &amp; Instrumentation Engg.\/ Instrumentation &amp; Control Engineering\/ Electronics\/ Electronics &amp; Telecommunication\/ Electronics &amp; Power\/ Power Electronics\/ Electronics &amp; Communication\/ Electrical &amp; Electronics Engineering<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 115.111px;\">\n<p dir=\"ltr\">NTC<\/p>\n<\/td>\n<td style=\"width: 114.736px;\">\n<p dir=\"ltr\">NA<\/p>\n<\/td>\n<td style=\"width: 269.042px;\">\n<p dir=\"ltr\">Textile Engineering &amp; Fibre Science (TF)<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"other-important-information-for-gate-2023-exam\"><\/span>Other Important Information for GATE 2023 Exam<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Click on the link to access other information &amp; study materials related to the GATE 2022 exam.<\/p>\n<table dir=\"ltr\" style=\"width: 100%; height: 270px;\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\"><colgroup><col width=\"100\"><\/colgroup>\n<tbody>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Eligibility Criteria 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-eligibility\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-eligibility\/\" target=\"_blank\" rel=\"noopener\">GATE Eligibility Criteria 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Exam Dates 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-exam-dates\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-exam-dates\/\" target=\"_blank\" rel=\"noopener\">GATE Exam Dates 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Application Form 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-application-form\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-application-form\/\" target=\"_blank\" rel=\"noopener\">GATE Application Form 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Syllabus and Exam Pattern 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-syllabus-and-exam-pattern\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-syllabus-and-exam-pattern\/\" target=\"_blank\" rel=\"noopener\">GATE Syllabus and Exam Pattern 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Books 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-books\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-books\/\" target=\"_blank\" rel=\"noopener\">GATE Books 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;Time Management Tips for GATE 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-time-management-tips\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-time-management-tips\/\" target=\"_blank\" rel=\"noopener\">Time Management Tips for GATE 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Question Paper 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-question-paper\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-question-paper\/\" target=\"_blank\" rel=\"noopener\">GATE Question Paper 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Admit Card 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-admit-card\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-admit-card\/\" target=\"_blank\" rel=\"noopener\">GATE Admit Card 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Result 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-result\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-result\/\" target=\"_blank\" rel=\"noopener\">GATE Result 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\"><a class=\"in-cell-link\" href=\"https:\/\/www.kopykitab.com\/blog\/gate-cut-off\/\" target=\"_blank\" rel=\"noopener\">GATE Cutoff 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Counselling 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-counselling\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-counselling\/\" target=\"_blank\" rel=\"noopener\">GATE Counselling 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Mock Test 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-mock-test\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-mock-test\/\" target=\"_blank\" rel=\"noopener\">GATE Mock Test 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Exam Analysis 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-exam-analysis\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-exam-analysis\/\" target=\"_blank\" rel=\"noopener\">GATE Exam Analysis 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Answer Key 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-answer-key\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-answer-key\/\" target=\"_blank\" rel=\"noopener\">GATE Answer Key 2023<\/a><\/td>\n<\/tr>\n<tr style=\"height: 18px;\">\n<td style=\"width: 506px; height: 18px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;GATE Preparation Tips 2022&quot;}\" data-sheets-formula=\"=HYPERLINK(R[0]C[-1],R[0]C[2])\" data-sheets-hyperlink=\"https:\/\/www.kopykitab.com\/blog\/gate-preparation-tips\/\"><a href=\"https:\/\/www.kopykitab.com\/blog\/gate-preparation-tips\/\" target=\"_blank\" rel=\"noopener\">GATE Preparation Tips 2023<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"type-of-psu-jobs-through-gate\"><\/span><strong>Type Of PSU Jobs Through GATE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We have listed some of the jobs through GATE with post for some of the major PSUs in the country.&nbsp;<\/p>\n<table style=\"width: 100%;\">\n<tbody>\n<tr>\n<td>\n<p><strong>PSU Name<\/strong><\/p>\n<\/td>\n<td><strong>Post<\/strong><\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>NALCO<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Graduate Engineer Trainee<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>ONGC<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Executive in Engineering and Geo-Science<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>DRDO<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Scientist &#8220;B&#8221;<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>IOCL<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Graduate Apprentice Engineer<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>NCL India<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Graduate Executive Trainee<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>NHAI<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Deputy Manager<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><strong>Kudremukh Iron Ore Company Limited (KIOCL) &amp; other PSUs<\/strong><\/p>\n<\/td>\n<td>\n<p><strong>Graduate Engineer Trainee (GET)&nbsp;<\/strong><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"salary-structure-of-working-in-psus\"><\/span>Salary Structure Of Working In PSUs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>If you are applying for PSU Recruitment Through GATE, you must know its perks too.<\/p>\n<p>Here we are presenting the salary composition of various PSUs for different positions such as Graduate Trainee (GT), Management Trainee (MT), Executive Trainees (ET), Graduate Engineers (GE), Engineer Trainees (ET), Graduate Engineers (GE), Trainee Engineers (TE) etc.<\/p>\n<p>PSU employees get paid good salaries which you can see mentioned in the table below.<\/p>\n<div>\n<table style=\"width: 100%;\">\n<tbody>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Name of PSUs<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Sector<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Status<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>Salary Structure<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>Salary CTC<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Airport Authority Of India Limited (AAI)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Civil Aviation<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini\u00ad Ratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 8,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>National Hydroelectric Power Corporation (NHPC) Limited<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Power<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini\u00ad Ratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Oil &amp; Natural Gas Corporation (ONGC) Limited<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Maharatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000-1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 16,50,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Coal India Limited (CIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Mining<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Maharatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 50,000 \u2013 1,60,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 11,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Indian Oil Corporation (IOCL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Maharatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 24,900-50,500 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 12,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>National Thermal Power Corporation (NTPC)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Power<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Maharatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 18,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Bharat Petroleum Corporation Limited (BPCL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 16,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Bharat Heavy Electricals Limited (BHEL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Defense<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 13,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Hindustan Petroleum Corporation Limited (HPCL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 16,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Gas Authority of India Ltd. (GAIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 16,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>National Aluminium Company Ltd. (NALCO)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Mining<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 40,500 -1,40,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 11,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Power Grid Corporation of India Limited (PGCIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Power<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 60,000 \u2013 1,80,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 20,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>National Fertilizes Limited (NFL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Fertilizer<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini\u00ad Ratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Neyveli Lignite Corporation Limited (NLC)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Mining &amp; Power<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 7,85,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Hindustan Aeronautics Limited (HAL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Defense<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Bharat Electronics Limited (BEL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Defense<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Mazagon Dock Limited (MDL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Defense<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini \u00adRatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 40,000-1,40,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 10,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Steel authority of india (SAIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Steel &amp; Iron<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Maharatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 10,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Mineral Exploration Corporation Ltd (MECL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Mining<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini \u00adRatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Visakhapatnam Steel Plant (VIZAG)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Steel<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Central Electronics Limited (CEL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Electronics<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 40,000-1,40,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 9,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Rail India Technical and Economic Service Limited (RITES)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Infrastructure<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini \u00adRatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\"><strong>\u20b9 40,000-1,40,000 \/-<\/strong><\/td>\n<td style=\"width: 82px;\"><strong>\u20b9 9,00,000 \/-<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>National Mineral Development Corporation Limited (NMDC)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Steel and Iron<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 16,400 &#8211; \u00ad40,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Bharat Earth Movers Limited (BEML)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Defense<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini \u00adRatna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 24,900-50,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Shipping Corporation of India Limited (SCIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Shipping<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Rural Electrification Corporation Limited (RECL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Power<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 20,600\u00ad &#8211; 46500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Engineers India limited (EIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Mini\u00ad Ratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 60,000-1,80,000 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Oil India Limited (OIL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Petroleum &amp; Natural Gas<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 24,900 &#8211; 50,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 121.986px;\"><strong>Power Finance Corporation Limited (PFCL)<\/strong><\/td>\n<td style=\"width: 112.806px;\"><strong>Finance<\/strong><\/td>\n<td style=\"width: 85.875px;\"><strong>Navratna<\/strong><\/td>\n<td style=\"width: 79.2083px;\">\n<div>\n<div><strong>\u20b9 24,900 &#8211; 50,500 \/-<\/strong><\/div>\n<\/div>\n<\/td>\n<td style=\"width: 82px;\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<ul>\n<li>Promotions: While working in PSUs you can get easy time-bound promotions, and different kinds of increments.&nbsp;<\/li>\n<li>Job Security: If you are working in a PSU, there will be job security. You can perform their tasks without any stress, which makes your work more impactful.<\/li>\n<li>Allowances: You will have great benefits from additional allowances that are a great package. There will be extra allowances like DA, telephone bills, Furniture, Personal systems, etc.<\/li>\n<li>Accomodation:&nbsp; PSU employees get HRA so that they can easily reside anywhere in the country comfortably.<\/li>\n<li>Medical Insurances: You will get the benefit of getting medical health cover also. You can also get health insurance for themselves and their families.<\/li>\n<\/ul>\n<p>This is the complete blog on <a href=\"https:\/\/dbtindia.gov.in\/about-us\/organization-structure\/public-sector-undertaking\" target=\"_blank\" rel=\"noopener\">PSU<\/a> Recruitment Through GATE 2022. To know more, ask in the comments.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"faqs-on-psu-recruitment-through-gate-2023\"><\/span>FAQs on PSU Recruitment Through GATE 2023<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1632824244067\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><span class=\"ez-toc-section\" id=\"what-is-the-selection-process-of-psu-recruitment-2023\"><\/span>What is the selection process of PSU recruitment 2023?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>You can find the selection process in the above blog.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1632824292719\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><span class=\"ez-toc-section\" id=\"what-is-the-educational-qualification-for-psu-recruitment-2023\"><\/span>What is the educational qualification for PSU Recruitment 2023?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Only those candidates can apply who have completed their graduation in B.Tech or BE, or the final students are also eligible for the GATE exam.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1632824352936\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><span class=\"ez-toc-section\" id=\"other-than-psu-recruitment-through-gate-what-are-the-other-ways\"><\/span>Other than PSU Recruitment through GATE, what are the other ways?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>You can get recruited through NET and through appearing for their direct examination.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1632824441658\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \"><span class=\"ez-toc-section\" id=\"what-is-the-age-criteria-for-the-general-category-for-psu-recruitment\"><\/span>What is the age criteria for the General category for PSU Recruitment?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>For General candidates, it is between 21-27 years.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>PSU Recruitment Through GATE 2024: If you are looking for a job in any of the PSUs, you must have a robust and high-intensity technical understanding and knowledge of middle engineering principles. You can do that by clearing the GATE exam where there are more than two thousand vacancies are currently available for a graduate &#8230; <a title=\"PSU Recruitment through GATE 2024 | Know The Eligibility, Exam Pattern, And More.\" class=\"read-more\" href=\"https:\/\/www.kopykitab.com\/blog\/psu-recruitment-through-gate\/\" aria-label=\"More on PSU Recruitment through GATE 2024 | Know The Eligibility, Exam Pattern, And More.\">Read more<\/a><\/p>\n","protected":false},"author":243,"featured_media":133194,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":""},"categories":[2924],"tags":[3228,3031,77032,77033],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/posts\/39937"}],"collection":[{"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/users\/243"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/comments?post=39937"}],"version-history":[{"count":4,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/posts\/39937\/revisions"}],"predecessor-version":[{"id":509757,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/posts\/39937\/revisions\/509757"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/media\/133194"}],"wp:attachment":[{"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/media?parent=39937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/categories?post=39937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kopykitab.com\/blog\/wp-json\/wp\/v2\/tags?post=39937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}