Mumbai University Previous year question papers Software Engineering Dec 2009

Mumbai University Previous year question papers

VI Sem IT Examination Dec 2009

Software Engineering

N.B.: (1) Question No.1 is compulsory.

(2) Attempt any four questions out of remaining six questions.

(3) All questions carry equal marks.

(4) Assume suitable data if necessary.

 

1.(a) Differentiate between Fp based and LOCbased cost estimation techniques

(b) Explain how Gantt-chart can be used for planning and controlling small Projects with example? What are the limitations of Gantt-chart?

 

2 (a) Explain various steps involved in SRSwith suitable example.

 (b) What is feasibility study? Explain its types, contents and purpose.

 

3 (a) Explain risk identification, risk projection,RMMMplan.

 (b) Explain the difference between-

 (i) White Box and Black Box Testing

 (ii) RADModel and Spiral Model.

 

4 (a) Explain SoftwareConfigurationManagementand change control  managementin detail.

 (b) Compareand Contrast Couplingand Cohesion.

 

5.(a) Explain different types of maintenance,with suitable example of each.

(b) Explain different steps in requirementengineering in detail.

 

6 (a) Describe data flow and control flow diagram with any suitable example.

 (b) Explain in detail software project plan with examples.

 

7 Write ShortNotes on any two :-

 (a) Reengineering

 (b) Design Concepts and Principles

 (c) CMMand Key Process Areas

 (d) Project Scheduling and tracking

Leave a Comment