Anna University Model Question Paper BE VI sem Mechanical COMPUTER AIDED MANUFACTURING

ANNA UNIVERSITY, CHENNAI 25

MODEL QUESTION PAPER

B.E. MECHANICAL ENGINEERING, VI SEMESTER

 ME 338 – COMPUTER AIDED MANUFACTURING

 

TIME – 3 Hours                                                                    MAXIMUM : 100 Marks

 

PART – A                     (10 x 2 = 20 Marks)

 

ANSWER ALL QUESTIONS

 

  1. What is the basis for forming groups in group technology?
  2. Justify the importance of rapid prototyping technology in the current day manufacturing scenario.
  3. Briefly state about the co-ordinate axis nomenclature of a modern CNC milling machine.
  4. Distinguish point  to point and continuous path CNC control.
  5. What is a machining center? How it differs from conventional CNC milling machine?
  6. What is a rotary type encoder?
  7. What do you understand by ‘modal’  and  ‘non-modal’ G codes
  8. What is meant by canned cycle? List any 4 types of canned cycle machining.
  9. What are the objectives of Product Data Management system?
  10. What is the philosophy of Just in Time (JIT)?

 

PART – B                        (5 x 16 = 80 Marks)

  1. 11.  (i) Describe  the types of electrical drives used for speed

and feed control in  CNC machine tools                                  (8 Marks)

 

(ii) Explain constructional features of linear slides of CNC

machines                                                                                  (8 Marks)

 

  1. (a). (i) Explain the Optiz coding system generally used in group

technology.                                                                          (8 Marks)

 

                  (ii) Explain the methodology to the followed for developing a

                      generative type computer aided process planning system (8 Marks)

(OR)

 

 

 

            (b). (i) Explain the stages involved in the development and

                       manufacturing of a new  product                                       (8 Marks)

(ii)  With a neat sketch, explain the principle of any one type

        of currently used Rapid Prototyping technology              (8 Marks)

     13.(a). (i) With a block diagram, explain the various sub-systems

                     and functions of a modern CNC controller.                         (8 Marks)

                 (ii) Explain the following in CNC machining

  1. Linear interpolation
  2. Circular interpolation
  3. Cubic interpolation                                                        (8 Marks)

 

(OR)

 

(b) (i)   What are the different types of contouring system in a

CNC machine? Explain with neat sketches.                        (8 Marks)

(ii)    Explain various types of input devices used in modern

CNC controller for loading programs.                                    (8 Marks)

  1. (a). (i) Explain the code used for the following in CNC part

program with example.

1.  Circular interpolation in XY plane

2.  Tool length compensation

3.  Absolute programming                                                   (6 Marks)

 

(ii) For the component shown in Fig Q 14 (a) ii, prepare the

part  program using ISO codes. Clearly indicate axis and

the selection of datum point on the sketch of the part.     (10 marks)

 

(OR)

 

         (b). (i)  Describe the function of a post processor in computer

                    aided of part programming                                                  (6 Marks)

                 (ii) For the shown fig Q 14 (b) ii, write part program

                     using the APT language.                                                   (10 marks)

  1. (a). (i) Briefly explain about production planning process in

discrete part    manufacturing                                                (8 Marks)

(ii)  Explain the following

1.  Master production scheduling

2.  Resource requirement planning

How are they related?                                                (8 Marks)

 (OR)

(b). (i) Write about the approaches to be followed to achieve

the goals of JIT.                                                                 (8 Marks)

(ii) Explain the various data required for a product

Data Management system                                                 (8 Marks)

`

Leave a Comment